LAKERIDGE OFFICE DEVELOPMENT
This corporate campus is located on a 15-acre site in the Overlake District of Redmond, Washington. A pedestrian-oriented site offers a park-like atmosphere with a variety of plazas and open green spaces. The four building Class 'A' office complex provides office space on three floors over two levels of below grade parking. The below grade structural system utilized soil nailing with PT slabs while the main building structural system is steel. The cladding is made up of glazed curtain walls pre-colored pre-cast panels, punched windows and metal paneling. TWIST
LOCATION:
Redmond, Washington
PROJECT DETAILS:
Office - 576,000 SF
Below grade garages - 600,000 SF
Parking Provided – 1,674
*Project completed while at G2 Architecture